Mismanaging Risk and Fukushima 2012

Mismanaging Risk and the Fukushima Nuclear Crisis1

Jeff Kingston


Introduction

“Though global safety standards kept on improving, we wasted our time coming up with excuses for why Japan didn’t need to bother meeting them.” Madarame Haruki, Chairman, Nuclear Safety Commission, Diet testimony, 2/15/12

The nuclear accident at Fukushima was precipitated by natural disaster, but poor risk management, including a failure to comprehend tectonic risk in the most earthquake prone country in the world, and an institutionalized complacency about risk, were major factors increasing the likelihood of a major accident and fumbling crisis response. Tokyo Electric Power Company (TEPCO), the utility operating the Fukushima Daiichi Plant, and the Nuclear and Industrial Safety Agency (NISA), the government regulatory authority, mismanaged a range of risks – siting, seismic, tsunami, emergency preparedness and radiation – and it is this mismanagement that made Fukushima into Japan’s Chernobyl. Investigations into the accident have established that the crisis response was improvised and inadequate because of lack of preparation, institutional flaws in emergency procedures, and poor communication within the government and between officials and TEPCO.

A private panel investigating the nuclear disaster concludes that TEPCO’s systematic negligence contributed to the nuclear disaster and criticized its “make-believe” disaster emergency arrangements.2 The myth that nuclear reactors could be operated with absolute, 100% safety embraced and promoted by what the Japanese call their “nuclear village” of pro-nuclear power advocates made it taboo to question safety standards and militated against sober risk assessment and robust disaster emergency preparedness. Those responsible for operating or regulating nuclear reactors bought into a myth of 100% safety and this collective failure left them unprepared to deal with an accident or worst-case scenario. Paradoxically, this safety myth explains why TEPCO lacked a culture of safety and why it’s crisis response was so deficient.

Politicians dealing with the accident lacked knowledge about nuclear issues and crisis management, and did not get sufficient support or information from bureaucrats or TEPCO to cope with the crisis. In addition, the failure to share information bred mistrust between key actors that impaired their ability to coordinate an effective response. One interviewee cited by the private panel compared the premier’s crisis management team to children playing soccer, preoccupied by the cascading disaster in front of them (chasing the ball) rather than strategizing accident response.3

This paper examines how TEPCO minimized risk assessments and preparations prior to 3/11, how it tried to shirk and shift blame since then, and is trying to mitigate risks to its operations involving nationalization and the sudden onset of nuclear allergy among Japanese.4  This paper also explores how citizens are responding to the fallout of Fukushima, a bottom-up approach to managing risk. Elsewhere I have examined TEPCO’s efforts to blame PM Kan Naoto for its own miscues and failure to prepare adequately for the evident risks.5 As we explore below, the nuclear village of pro-nuclear advocates had much to gain by shifting blame to Kan and diverting attention from the institutional problems that are at the heart of the crisis.6

A record magnitude 9 earthquake and subsequent 15-meter tsunami devastated the Tohoku coastline on March 11, 2011, claiming some 20,000 lives and inundating the Fukushima Daiichi nuclear plant. These extreme seismic events were the proximate causes that led to the loss of electricity and the failure of backup generators.  The ensuing cessation of the cooling systems caused three meltdowns within the first 80 hours and the hydrogen explosions that released plumes of radiation, spreading radioactive contamination in surrounding areas but also further afield due to strong spring winds. The long-term health effects are uncertain, but the costs of the nuclear crisis have been enormous and are mounting. The reckoning includes displacement of some 80,000 residents within the 20 km evacuation zone around the crippled reactors, many of whom will probably never return to their homes, loss of livelihoods suffered by local farmers, fishermen, and various businesses in Fukushima, together with anxiety about radiation and even the stigma of radiation that confronts the people of the prefecture. This stigma follows those who leave to restart lives elsewhere and raises concerns among young people concerning marriage prospects and raising families.  In addition, there has been a wider economic fallout as bans on Japanese products were imposed overseas and overall in-bound tourism declined by 25% in 2011. Moreover, the nuclear crisis tarnished the Japan-brand, eroding the nation’s reputation for technological prowess. Restoring what people and the nation lost will be costly and take considerable time. Compensation for losses are mounting while the costs of decontamination, disposal of tainted debris and decommissioning nuclear reactors will boost the final reckoning immensely. The Japanese will be paying for the folly of Fukushima for generations to come.

It is important to learn lessons from the poor risk management in the nuclear industry because Japan will probably continue to rely on nuclear energy for years to come despite the Fukushima debacle. All but 2 of the nation’s 54 reactors are currently idled, and all will be offline by May.

mismanaging01 800Status of Nuclear Power Plants, Feb 2012

METI Minister Edano Yukio predicts that Japan will not be relying on any nuclear energy this summer and favors minimizing reliance on nuclear energy and replacing it with renewable energy.7 Perhaps, but there are ongoing efforts to restart some reactors based on stress tests that are based on computer simulations meant to determine whether it is safe to resume operations. Polls show that from two-thirds to three quarters of the public wants to eliminate or reduce nuclear energy, but the utilities have invested vast sums in this option, one made possible only by vast government subsidies, and the powerful nuclear village opposes pulling the plug. Moreover, it will take time to ramp up renewable energy generating capacity. While renewable energy may have a promising future in Japan, in the meantime it is important that regulators and operators minimize the inherent risks of operating nuclear plants in a seismically active nation by learning the lessons of Fukushima and implementing more stringent safety measures and improved crisis response procedures.


Embracing Risk

Fukushima was preceded by a series of mishaps, cover-ups, irresponsible practices, close calls and ignored warnings. In that sense, it was an accident waiting to happen. Charles Perrow has written extensively on the inevitability of accidents in organizations predicated on complex technologies and the problem of unexpected interactions that may cause a cascading disaster such as occurred at Fukushima. He writes,

Weiterlesen: Mismanaging Risk and Fukushima 2012 

Atomkraft

pr_fs_atomkraftWebpage   von Prof. M. Repp zur Radio aktivität von Fukushima und überall

 

ICAN  ican logo 170

Nuke-free Earth

Christian Network for a Nuke-free Earth (seit 2011) cnfe logo 170x110
E-Mail

Japanische Bischofskonferenz

Japan Catholic Council for Justice and Peace

Atomkraft: alle Beiträge

Nuclear Phaseout: alle Beiträge

Free of Nuclear Power: alle Beiträge